View our featured projects below, then get in touch with us
We are proud to show you our latest projects. You will find a diverse gallery of developments, engineering work, installations and many others.
Mindef 3-yr Camps Maintenance
Slope Protection Works at Kota Batu, Sg. Teraban, Labi
Upgrade fences 15nos at VIP Houses Complex, spg 52 kg Beribi
Building Rectification Works 30 houses, Bk Beruang National Housing
Renovation works at ITB exclusive corridor
New Clothes Lines & Metal Roof Awning To Sentosa Flat
Renovation Works For Soya Bean Paste Factory
Pipe-jacking works, various locations
Proposed Construction of Facility Buildings for Royal Brunei Navy
Supply/deliver pallets
Storage Pallets for Agricultural Use, Supply
Earthing at Substations, Various Locations
Refurbish Main Intake Stations, Civil Works, Brunei-Muara
Perimeter Fence Construction for Substations, Various Locations
Replace 1no 80KVA Standby Genset at Pulau Baru-Baru
Menglait Link Street Lights & Civil Works
S/I compound lighting for Istana Kota Mengellela
Reloc Existing High Voltage Cable 3C/185mm2 at Kiulap & kiarong
Mahad Islam School Electrical Installation, Tutong
Flat Kelas ‘E’ PWD 168, pekan Bangar, Temburong II elect intall
Flat Kelas ‘E’ PWD 168, pekan Bangar, Temburong I elect intall
Install DB & electrical system at Anggereek Desa Flat
Electrical works for Muzium Maritim Substation
Rectification of External & Deco Lighting Darul Afiah
Transmitter Hut 150KVA
Tutong Cookhouse 250kVA genset
Pandaruan Bridge Approach Street Lights Elect. Works
Kiarong terraces urgent supply of appliances
Golf Course Lighting Control Panel Replacement
Agrotech substation, HV cable laying
Balai Bomba Colour Bulbs
Genset 60KVA at medical Store, Ripas Hospital
RBPC 5 Automobilla Electrical Maintenance
RBPC 5 electrical Maintenance, Jerudong
RBPC 5 VVIP Residence Maintenance, Jerudong
Makmal Veterinar 500kVA genset
Manpower to Perform Power Station Maintenance, Temburong
Lightning Protection at MOFAT
External Cabling to Police Flats, Temburong
High Mast Lighting Maintenance, Jerudong
Genset 300kVA, Ammo Depot, Penanjong
Industrial oscillating fans, Muara base
Genset Maintenance for 1-yr. International Convention Centre
University Hostels Appliances & TVs, supply & install
VVIP Residence Elect. Maintenance for 1-yr
500kVA Genset for Veterinary, Agriculture
Lightning Protection at MOFAT
External Cabling to Police Flats, Temburong
High Mast Lighting Maintenance, Jerudong
Waste Management System Elect. Works, Sg. Paku, ST Marine
300kVA Genset for Ammo Depot, Penanjong
VIP Residences Appliances & TVs, supply & install
Switchboards, Cables Replacement, Elect. Works at Damuan Park
External Cabling, Pintu Malim School
Sg. Akar Mosque Electrical Works
Transformers & 1,600A Feeder Pillars, Supply
Construct Substation & Elect. Equipment Installations, Padnunok, Tutong
30-unit Housing External Elect. Works, Kg. Katok
Street Lights, Kg. Ayer Locations
Overhead Elect. Supply to Prawn Farm, Temburong
11kV, 415V Network Reinforcements, Various Locations
11kV Distribution Transformers Technical Maintenance, B-Muara
LV Cable Supply, 4c x 120mm2, Aerial Cables
100kVA Standby Genset, Lamunin Health Clinic
Diversion of 11KV Cable at Jalan Selapon, Temburong
Electrical Supply to Ladang, Batang Mitus
Cable recovery, Re-coiling, various locations
Bolkiah Office Renovations, Elect. & Aircon Works, MinDef
Elect. Works to MOD Training Centre
Elect. Works for Upgrading of Kg. Pandan Sewerage Treatment Plant
Replace Dead Tank Circuit Breakers, Various Locations
Supply and Installation of Street Lighting at Kg. Bebatik Kilanas
Substation Construction & Elect. Equipment for Skh Ugama Tg Maya
External Installation of Fibre-optic Cables for DST, Various Sites
Upgrading of Street Lighting for Spg. 66, Kg. Bengkurong
Supply and Installation of Street Lighting for Jalan Panchor Murai
Supply and Installation of Street Lighting for Kg. Keramut Danau
University of Brunei Darussalam Gallery Aircon, Elect. Works
Diversion of Outgoing Cables from existing RMU-3, Istana
Replacement of Damaged Street Lighting Columns in Tutong District
BMC Methanol Plant Elect. Modifications – Mitsubishi Heavy Industries
Electrical Maintenance Polo Club & Mini Stadium High Masts
Maintenance of External Lighting, Istana Afiah
HV Electrical Supply from Bk Panggal School to Substation
HV Electrical Supply from Serambangun Sawmill to Sengkarai
Sg. Bera Industrial Substation Elect. Works
Narcotics Flats, Electrical Supply
Earthing System for 66kV, Lamunin
Kiudang Mosque External Substation Works
Upgrading F. G. Wilson Genset Panel Controls
Power Centre Switchboards Replacement, Istana
Electrical Switchboards Replacement, Agriculture HQ
Brunei Methanol Plant Electrical & Earthing Works, PT Rekayasa
Electrical Works for Flood Control, Seria
Supply/Install Street Lighting – Rataie, Temburong
Royal Brunei Naval Base Sec 7 Street Lighting Upgrading
Install Compound Lights at Min. of Foreign Affairs Bldg.
Supply/Install Street Lighting – Pisang, Serasa
Supply/Install 3-phase Weatherproof Cut-Out Fuses for Columns
Compound Lighting at Hjh Mariam Hospital, Temburong
500kVA genset for Pump Station 6
Electrical Supply Boxes & Earthing for Mobile Phone Operator DST
Street Lighting for Sengkurong, Kilanas & Pengkalan Batu
Airconditioning Works for Kg. Katok 6th Form School
200kVA genset & UPS System for Sinaut Agriculture
Officer’s Mess & Sgt. Mess Building 3rd Battalion Elect. Works, Lumut
Street Lighting at Tahfiz Al-Quran School
Relocation & Upgrading of Main Isolators, F Flat 38 Blocks, Penanjong
External Lights Maintenance for Army Camps, B-Muara, Tutong & Temburong
400KVA Gensets for Dept. of Electrical Services & Housing Dept.
Shakirin Shophouses, Kiulap 40 units Elect. Works
Jati Freedom Textiles, Elect. Works Upgrading
400kVA Gensets for Penanjong Camp & Tutong Camp
Extension to Seria Sewerage, Elect. Works
Subok Fire Victim Flats, Elect. Works
Rimba Mass Housing, Tungku, Elect. Works
250 kVA Genset, Bolkiah Camp Computer Section
PGGMB School, Sg. Akar Elect. Works
Decorative Lights for Istana & Government
Rimba Landless Citizens Mass Housing, Elect. Works
Lambak Kiri Mass Housing, Elect. Works
Jubilee Hotel & Plaza Elect. Works
Lambak Kanan Mass Housing, Elect. Works
Gensets Maintenance, ICC, B. S. Begawan
Total E&P gas hose flex inspection
LUMUT Sewerage Treatment Plant
Drainage, Sewerage Works to 150 houses, Mentiri National Housing
Drainage Works, Sg. Hanching
Kidde Chemical Fire Protection for Kitchen Hoods, MinDef
Upgrading Work of Seria Sewerage Treatment Plant
Replace Poles, Slim-poles and Stray Wires, Various Locations
Overhaul Generators at University Brunei Darussalam
DST HQ Maintenance, and Counters Maintenance
Outdoor Announcement System, UNISSA
Supply, Delivery, installation, public address sys @ Gen Post
Supply and Delivery of 3R1T Ring Main Unit
MRS Muara Supply and Install Tel, cctv, SMATV, projector
Fibre-optic external cabling, various locations
Waste Management System, Sg. Paku, ST Marine
Computer Cabling at Finance Ministry, Police HQ, etc.
Telephone Network, FIBUA, Penanjong
Get in Touch
If you’ve got questions or ideas you would like to share, send a message. For anything more specific, please use one of the addresses listed below.
Our Location
DARe Mulaut Industrial Park, Lot 13 LTS 65/97, Spg 41-12-34, Jalan Kilanas-Mulaut, Kg Kilanas, BF2520, Negara Brunei Darussalam
Find Us on Map
Phone Number
(+673) 2342457
(+673) 2330673
(+673) 7185068
Our Emails
menaragen@gmail.com
68menara@gmail.com
hrmenara@gmail.com
Let's Talk About Your Project
After we get some information from you, we’ll set up a time to discuss your project in further detail.

